Friday, January 27, 2017

ShurTape Mission HVAC

Shurtape Mission HVAC is looking for applicants who are willing to write small blog posts about HVAC in return for $500 per post at 10 posts per year. That is $5000 for researching and writing 10 short blog posts. We have had students participate in this program in the past and they found it very rewarding. Sadly, the Shurtape folks don't want worn out HVACR instructors, or I would be all over that. They want HVACR students. You need to move quickly, the cut-off date is February 3.
You can contact

Laura Pierce
lpierce@shurtape.com
Senior Media Manager
Shurtape Technologies, LLC
1712 8th Street Drive SE
Hickory, NC 28602
P +1-828-267-8506

To see more about the program look here

Saturday, January 21, 2017

Deja Vieux

We have been here before. An outgoing administration is promulgating lots of final rulings in their last gasp and an incoming administration is working hard to undo those rulings. We the regulated, are caught in the middle.

SEER 13 SEER 12 SEER 13
Just before January 20, 2001 when Bill Clinton left office, the Department of Energy upped the minimum SEER from 10 to 13. The change was to take effect in 2006. ARI objected and the Bush administration agreed to drop the minimum from 13 to 12. The DOE published the new 12 SEER standard in May 2002. Several states as well as national environmental and consumer groups successfully sued.  On Jan. 13, 2004, the U.S. Appeals Court for the 2nd Circuit, based in New York, ruled that the DOE did not follow "proper procedures" when it adopted its 12 SEER standard in May 2002. The more stringent 13 SEER standard was reinstated.

This is an oversimplification of the actors and events, but tell the basic story. Instead of having from 2001 until 2006 to reinvent their product line, manufacturers had only from May of 2004 until January of 2006 because of the regulation wars. In retrospect, it would have been far easier to shoot for the 13 SEER target from the beginning and have several more years to accomplish it.

HFC Phasedown
Like a case of deja vieux, the outgoing Obama administration just signed a Global Warming amendment to the Montreal Protocol this past October and the incoming Trump administration wants to scrap all Global Warming initiatives. However, AHRI is not beating the drums to slow down or scrap the HFC reductions. Instead they are saying that what they really want is regulatory consistency and certainty. In other words, they don’t want to relive the 2001 – 2006 SEER wars.

Nothing is Constant but Change
There are mid-term elections in two years, and the ruling party almost always take a beating, meaning the senate may change hands in two years. If this election has taught us anything, it is that we cannot know for certain who will be heading up the government in four years. In eight years we are guaranteed to have a change at the top. It takes years to develop and test new products, and the last thing any manufacturer wants is to have the design parameters altered drastically and capriciously based on the latest election. Even if the challenges are steep, they can be met with a reasonable time for development if you don’t keep moving the goal posts.

To read more about the history of the SEER wars read this excellent article in the NEWS.
http://www.achrnews.com/articles/97373-how-we-got-to-13-seer

To read more about AHRIs position on the HFC phasedown, read this NEWS article
http://www.achrnews.com/articles/134252-kigali-agreement-creates-orderly-phasedown-of-hfcs

Saturday, January 7, 2017

CSST Gas Lines

If you use flexible gas connectors or CSST (corrugated stainless steel tubing) when hooking up the gas to a gas appliance, you need to make sure and do it safely. Flexible gas connectors are made of corrugated stainless steel and generally have no outer covering or protection. They are often used to connect a gas appliance to a rigid iron gas line. 

CSST, on the other hand, has an outer covering over the corrugated stainless steel, comes in large rolls, and is often used instead of black iron when piping gas lines. There are some installation practices for each of these products that need to be followed to avoid setting up a dangerous situation.

For flexible connectors, it is important that they not be used to go through walls, floors, or the unit cabinet. Iron pipe should pass through the unit cabinet to the gas valve. Contact with the metal side of the furnace cabinet can rub a hole in a flexible connector. Another reason for keeping flexible connectors out of the cabinet is the potential for loose electrical wires or connections to arc against the flexible connector and blow a hole in it. While this could also happen with black iron, there is far less likelihood of the arc blasting a hole in the iron. 

Flexible connectors can be used to make the final connection between the black iron leaving the furnace cabinet and the black iron piped into the furnace area. When using a flexible connector, the flared connectors are generally considered “unions.” Don’t forget to install a gas shutoff. Some flexible connectors are provided with a gas shutoff.

CSST is similar to flex connectors in construction with an outer layer of protective plastic. CSST can be pulled through interior walls, but metal nail protectors are required anywhere the CSST is inside the wall. CSST manufacturers make striker plates for this purpose. Protection needs to be approved by a listing agency, such as CSA or UL. Also, it is still best to use black iron to go into the furnace cabinet. The best practice is to penetrate exterior walls with black iron. If CSST is used to penetrate an exterior wall, protection is required.

One of the biggest safety concerns with both flexible connectors and CSST piping is properly grounding the gas piping system. There have been many instances where lightning strikes near a building have blown holes in CSST gas lines or connectors. The grounding is to avoid this. The most common practice is to connect a bonding ground wire to the rigid black iron pipe outside the house BEFORE the first CSST connection. This bonding ground is connected to the ground rod or run inside to the ground bus of the electrical panel.

Here are a couple of links for more information”
Grounding: http://www.csstsafety.com/CSST-solution.html

Installation: http://www.tracpipe.com/Technical/CSST_Installation_Instructions/  

Monday, January 2, 2017

Don't Forget the V

I recently spent some time in Hawaii and noticed that many buildings, both residential and commercial, had no heating or cooling systems. Instead, many only had provisions for ventilation. You see, the temperature in Hawaii rarely gets too far out of the comfort zone, so they condition through ventilation. Now to be sure, there were certainly times when I wished where I was staying at least had a dehumidifier, but the temperature was never an issue. Larger commercial buildings did have air conditioning, but smaller stores usually did not. All  buildings had lots of provision for letting the outside air in.
Hawaiian Air Conditioning

In talking about HVAC we often forget to spend any time discussing the V – ventilation. Even if your building has heating and air conditioning, some amount of ventilation is necessary to maintain healthy comfort conditions. The more people and activities you have inside, the more ventilation you need. Most commercial buildings with large central ducted systems have the ventilation built into the duct system. Another common arrangement is to have a dedicated ventilation system whose only purpose is to pull in ventilation air from outside and expel stale air from inside. These systems are often used for buildings which do not have centrally ducted systems. For example, a building which uses VRF systems to heat and cool often have dedicated ventilation systems.

For years residential buildings have depended upon infiltration to provide ventilation. With increasingly tight houses, this method is becoming unworkable. Even for leaky houses this is far from ideal because  you don’t have any control over how much “fresh” air leaks into your house, or where it is coming from. Some may be coming in through your fireplace or crawlspace. In that case, it may not be very “fresh.”

Residential ventilation systems are now available that allow you to control the amount of outside air entering your house. By adding the outside air into your duct system, you can also control where it enters. Another benefit to adding outside air purposefully with a ventilation system is that it can be filtered and conditioned before entering the living space. I encourage you to think a little more about the V in HVAC. You might find it to be a breath of fresh air.

Sunday, December 18, 2016

Refrigerant Line Sizing

Refrigerant line sizing is an overlooked aspect of system application and installation. Incorrectly sized refrigerant lines can rob your system of capacity and reduce its efficiency. In a worst case scenario, incorrectly sized and applied refrigeration lines can cause multiple compressor failures. For most applications, the two lines involved are the liquid line and the suction line. 

Pressure drop in the liquid line can create flash gas in the line before the refrigerant reaches the metering device. This causes a drop in system capacity because it reduces the amount of liquid entering the evaporator. Some pressure drop is inevitable. It is important to have enough liquid subcooling to offset the pressure drop through the liquid line. 

Suction line pressure drop also hurts the system performance by increases the compression ratio and reducing the amount of refrigerant being circulated. The general rule is to try and keep suction line pressure drop below an equivalent saturation temperature drop of 2F. The actual amount of pressure this represents depends on the refrigerant and the evaporator saturation temperature. Suction lines have another very important design criteria: the refrigerant traveling through them must have sufficient velocity to return oil. While larger lines help reduce pressure drop, they also decrease refrigerant velocity. In general, you want your suction line to be as large as possible while still having enough velocity to return oil. 

There are far too many variables to mention in a blog post, but I can point you toward some excellent materials available online. DuPont and Lennox both have excellent refrigerant piping handbooks available on the web in pdf form. The Dupont document is applicable to all forms of refrigeration while the Lennox material is primarily for air conditioning. Virginia Air has a great excel file which does a lot of the heavy lifting for you in calculating pressure drop and velocity. They also have several line sizing tables on another tab of the excel file. I guarantee that you will learn something about line sizing if you download and examine these three wonderful resources. I know I did.


Lennox

Virginia Air

Monday, December 12, 2016

Cold Weather Heat Pump Charging

Charging an air source heat pump during cold weather has always been a bit of a problem. The problem is that the amount of refrigerant circulated decreases as the outdoor temperature drops. Why is this? Well, as the outdoor temperature drops, the evaporator temperature has to drop in order to be able to absorb heat from the outdoor air. The lower evaporator temperature produces a lower evaporator pressure. The lower evaporator pressure increases the compression ratio because there is now a greater difference between the suction pressure and the discharge pressure. The higher compression ratio means that the compressor does not circulate as much refrigerant.

At a 45°F outdoor temperature,  a typical air source heat pump produces a heating capacity roughly equal to its nominal cooling capacity. At 17°F outdoor ambient, it produces about half as much heat as it does at 45°F. This difference in capacity is directly related to the amount of refrigerant being circulated. The rest of the refrigerant is just sitting somewhere – normally in either the accumulator or the charge compensator. So a system operating at 17°F outside could have perfect pressures even if it only had half of its factory charge. That is why you can be way off checking a heat pump by pressures in the heating mode.

Some manufacturers provide heating performance pressure charts, but refer to them as “check” charts. They are intended to check the system operation at specific conditions, but are NOT intended as guides for adding refrigerant. The problem is that you don’t have a good way to judge how much refrigerant is stored out somewhere in the system. I can hear a bunch of you saying that measuring superheat and/or subcooling solves that problem. While I AM a fan of checking both, they still just measure the refrigerant that is circulating.

There have been some interesting methods used, such as measuring discharge superheat. For discharge superheat, you measure the temperature and pressure of the discharge line right as it leaves the compressor. It should be somewhere around 60°F warmer than the discharge saturation temperature. So if you have a 410A system running at a discharge pressure of 318 psig (saturation temperature 100°F), the discharge line should measure 160°F. A lower temperature reading indicates an overcharge and a higher temperature reading indicates an undercharge. The surest way to charge a heat pump in the winter is to recover the refrigerant, evacuate the system, and weigh in the correct charge. If you have performed a repair on the refrigerant system, then this will save you time and insure a correct charge.

Saturday, December 3, 2016

Cranking Out The Rules

 With only weeks left in the Obama administration, federal agencies such as the Energy Efficiency and Renewable Energy Office (EERE) are finishing up work on a number of initiatives and publishing final rulings. Who are the EERE? They are a subset of the Department of Energy (DOE). These rulings have an impact on the HVACR industry. While the rulings do not have a direct effect on technicians in the field, they have a big effect on HVACR manufacturers. Indirectly they will affect us as manufacturers respond to the directives. Most of the rulings have to do with how different equipment is tested by the manufacturer, and in some cases, what equipment is covered.  Here is a list of recent rulings with links for more information.

12/02/2016 DOE Issues a Notice of Final Rule Pertaining to Test Procedures for Walk-in Coolers and Walk-in Freezers

12/01/2016 DOE Issues a Notice of Final Rule Pertaining to Test Procedures for Compressors

11/30/2016 DOE Issues a Final Rule Pertaining to Test Procedures for Central Air Conditioners and Heat Pumps

11/21/2016 DOE Issues a Comment Period Extension Pertaining to Energy Conservation Standards for Residential Furnaces

 11/15/2016 DOE Publishes a Final Determination of Compressors as Covered Equipment

11/10/2016 DOE Publishes a Final Rule Pertaining to Test Procedures for Commercial Packaged Boilers

10/07/2016 DOE Issues a Final Determination Pertaining to Energy Conservation Standards for Direct Heating Equipment  

10/04/2016 DOE Issues a Direct Final Rule Pertaining to Energy Conservation Standards for Miscellaneous Refrigeration Products