I had the pleasure of attending the Comfortech Conference in Nashville, Tennessee this past week. A national convention like Comfortech provides the opportunity to meet and talk with industry leaders from all over the country. I set out to pick as many brains as possible. The people staffing the booths impressed me not only by their level of expertise and experience, but also with their generosity. I found that everyone was very willing to talk with me. When I introduced myself as an air conditioning instructor their faces seemed to visibly brighten. They wanted to talk about what they felt was important to teach. The people in our industry want to help us, because they recognize the importance of education to their own success.
Saturday, September 26, 2009
Comfortech 2009
Saturday, September 19, 2009
R22 Conversion
Most HVAC/R programs have a large number of R22 air conditioning systems in their shop. The ban on the use of R22 in new equipment begins January 1, 2010 – only a few months away. Although R22 will be available for servicing existing equipment, the amount of new R22 available is scheduled to be reduced by 75% in 2010. The EPA and many people in the industry believe that this will create a shortage of R22 in 2010. What this all means is that R22 will become more expensive and harder to get. I began exploring for an R22 replacement refrigerant to keep our shop equipment operating when R22 is either not available or not affordable. I would like to share a few things to consider when examining potential R22 replacement refrigerants.
Whenever possible check with the equipment manufacturer. Chances are they have some insight into what works, and more importantly, what does not work. Copeland has a six page service bulletin that discusses conversion from R22 to R422A and R422D in commercial refrigeration systems.
Tecumseh offers five service bulletins that discuss R22 refrigerant conversion. They are available at
There are a number of replacement refrigerants offered to replace R22 in existing systems. However, even if the system operates and cools, there are some potential negative outcomes that you should be aware of before proceeding.
Make sure that any refrigerant you propose to use has been approved for use by the EPA. You can check the SNAP list to see if the refrigerant is listed.
There are many hydrocarbon based replacement refrigerants for sale on the internet which are NOT approved by the EPA for use in the US. Some are even manufactured in the US, but they may not be used in the US.
For the most part, most manufacturers do not endorse refrigerant conversions. Just because the EPA approves a particular refrigerant does not mean that the manufacturers must approve its use. Using a replacement refrigerant that is not approved by the manufacturer usually means any warranty is voided.
Systems may lose their UL approval since the UL testing was done with the original refrigerant. Many alternate refrigerants have been tested and classified by UL, but many have not. Consult UL or the refrigerant manufacturer to find out if the refrigerant is UL classified.
Zeotropic refrigerants (400 series blends) should never be used for flooded chillers. The refrigerant will separate in the evaporator. Since nearly all replacement refrigerants are 400 series blends there are very few acceptable non-ozone depleting replacement refrigerants for flooded chillers.
Finally, the refrigerant manufacturers will help. Even if you decide to proceed without the equipment manufacturer’s help you are not entirely on your own. The refrigerant manufacturer also bears responsibility for the application of their product. All refrigerant manufacturers offer application bulletins and guidelines for the use of their products. A few are:
Smaller companies that primarily manufacture replacement refrigerants obviously have an incentive to help. ICOR has one of the most interesting support ideas – a toll free telephone number which you can call to talk to an experienced service technician.
For more detailed information on refrigerants check out Unit 23 Refrigerants and Their Properties in Fundamentals of HVAC/R. For specific details on complying with EPA refrigerant regulations check out Unit 26 Refrigerant Management and the EPA in Fundamentals of HVAC/R.
Thursday, September 10, 2009
Teaching Green Technology
I am sure by now everyone has heard about the green revolution. Chances are, you have been asked what you are doing to teach Green Technology? You might feel that you are not doing anything about teaching Green Technology, but I bet you are teaching Green Technology without realizing it. First, your students are already ahead because they are in school. They will be more likely to read and follow instructions than someone who is just “doing it the way we have been doing it for 20 years.” New installation and service techniques develop along with new equipment and technology. Installing a 20 SEER air conditioner incorrectly effectively erases its efficiency advantage. Therefore, the first and foremast Green Technology we should be teaching is correct system installation. Chances are the text you are already using discusses Green Technology. Fundamentals of HVAC/R includes 13 Units that include information relevant to Green Technology. Unit 54 Basic Building Construction , has a section on Green construction.The idea is the Green Technology is more than a separate device or product, but is a new way of thinking and doing things. These 13 Green Technology units are identified in the table of contents with a green asterisk after the unit title. If you are looking for a text that is specifically Green, take a look at Pearson’s Your Role in the Green Environment, or Green Building Fundamentals, or Sustainable Construction and Design. To read more about these texts visit pearsonhighered.com
http://www.pearsonhighered.com/educator/product/Green-Building-Fundamentals/9780135028391.page
If you are exploring Green Educational programs there are several alternatives ranging from a simple Green Awareness program to offering instruction in fields like Testing and Balancing or building Commissioning. If you would like to offer a Green Awareness program and certification you might check out ESCO’s Green Awareness program http://escoinst.com/GreenawerenessCertification.htm
Testing and Balancing and Building Commissioning are professional fields requiring specific training and credentialing, but if your school is serious about being Green, they are areas to look into. Without testing and balancing and commissioning, you really don’t know if the building and systems are performing as designed. You can get more information on Testing and Balancing at http://www.nebb.org or http://www.tabbcertified.org/ For building commissioning check out the Building Commissioning Association http://www.bcxa.org/ or the “Whole Building Design Guide” by the National Institute of Building Sciences http://www.wbdg.org/project/buildingcomm.php
Again, I firmly believe that the HVAC/R field can be considered a Green Field when done correctly. After all, the Greenest design on paper turns brown if it is not properly installed.
Sunday, September 6, 2009
Teaching Ohm's Law for Parallel Circuits

Saturday, August 29, 2009
Understanding Centrifugal Fan Motor Performance
The most convincing way to teach this concept is to have students figure it out for themselves using a centrifugal blower. Have them operate a centrifugal blower in free air with no restriction and measure both the amp draw and the fan RPM. Note that most centrifugal blowers cannot operate in free air for an extended time without overheating, so try and keep the free air operating time to a minimum. Next have them block one side of the air intake with a piece of cardboard and recheck the amp draw and RPM. Typically the increase in RPM is immediately obvious, but measurements prove the point. Have them slide the cardboard to block the intake only half way while watching the amp draw. A few minutes of experimentation will convince the students that blocking the intake actually causes an increase in RPM and a decrease in the motor amp draw. Next have them partially block the fan outlet while checking the amp draw. Once again, the amp draw will decrease. Allow them a few minutes of play time to convince themselves. This experiment does more to explain centrifugal blower motor performance than a week’s worth of lectures.
Thursday, August 20, 2009
Teaching Residential Design
I don’t think every Air Conditioning Technician needs to be able to whip out a Manual J load study, but I do think all technicians should be familiar with the overall concepts and general procedures used. Sometimes, the first step to learning is understanding how much you don’t know. Introducing technicians to the proper way to do a load study can be the light in the darkness that illuminates the path to greater understanding.
The truth is that the procedures are really not that difficult once you understand them. They will still take more time then dividing the square footage by a magic number, but an accurate load study on a typical residential home generally takes less than 30 minutes for someone who understands the process. It is true that you will have to invest hours of your time to get to that point, but that is really no different than any other skill that is required to perform HVAC/R work. The fact that time and effort are required to develop the skills and knowledge required to perform the job is part of what makes HVAR/R jobs valuable. The job is not as simple as memorizing a handful of rules of thumb.
Section 7 in Fundamentals of HVAC/R gives students the information they need to understand residential air conditioning application and system design with several unique features not found in other major air conditioning texts. The System Design, Sizing, and Layout section begins with Unit 54 which describes how buildings are constructed. It is important for students to understand how the air conditioning system fits into the building. Decisions about unit location, duct location, general duct design, and register placement are all very much affected by the building construction. Unit 55 shows students how to read and interpret drawings. Often, the first “look” an air conditioning technician has at a building will be in the form of a drawing. Teaching students how to interpret blueprints allows them to understand the building construction, even before the building is built. Unit 64 takes the students step by step through a manual J8 load calculation. Fundamentals of HVAC/R is the only major text to discuss the use of Manual J8, the latest version of ACCA Manual J, the ANSI standard for residential load studies. Unit 57 shows students the types the different types of duct systems available and how they fit different types of building construction. Unit 58 shows how to install duct systems and how to use friction charts and the ACCA Duct Calculator to design duct systems.